Answered from How to Progress Faster Than Everyone Else (as an engineer) · A Life Engineered · 2026-10-23
Steve Huynh argues that splitting time between two projects does not make you 50% effective on each; it is more like 15% on both, and worse with three or more. So when a main project is blocked waiting on someone, he advises against starting a second one and recommends thinking ahead on the primary project instead, even if that work turns out to be throwaway.
Source: our own transcription of the episode. The full conversation is on A Life Engineered (2026-10-23). Read the whole episode summary →